Based in Pomona, CA. Free on-site estimates across the Pomona Valley. Call (909) 699-1776
Dark flake floor in a bright retail suite, commercial epoxy floor in Fontana
Charcoal flake floor in a narrow tenant space, shop epoxy floor in Fontana
Fontana garages, shops and warehouses

Epoxy Flooring Fontana, CA

Garage floors for Fontana homes and business floors for the shops and warehouses near the 10, 210 and 15.

  • One-day flake garages
  • Topcoat rated for hot-tire pickup
  • Free estimate in Fontana
  • Limited lifetime adhesion warranty

★★★★★ 5-Star Rated · 93 reviews on Google, Facebook, Houzz & more

Free on-site estimate

Tell us about the floor and we will call you back to book a visit.

Or call (909) 699-1776

Projects from$2,600two-car flake garage, installed
Flake install1 daywalk on it the same night
WarrantyLimited lifetimeadhesion warranty, in writing
EstimateFreeon-site, with a moisture test
Fontana costs

Epoxy floor prices in Fontana

A Fontana flake garage of up to 400 sq ft costs $2,600 to $4,000, done in one day. Shops and warehouses get a written quote after a free site visit. See how that works on our commercial epoxy flooring page.

A. B. Miller founded Fontana, which was called Rosena until 1919, and it stayed mostly rural until the Second World War, when Henry J. Kaiser built a large steel mill in the area. Permit questions go to the City of Fontana.

We drive east from our base in Pomona for every Fontana estimate.

Charcoal flake floor in an empty office, quartz broadcast floor in FontanaQuartz broadcast floor, Fontana
Fontana install steps

How we coat a Fontana garage

A Fontana flake garage takes one day.

  1. Test the Fontana slab

    We meter the slab and note heat exposure.

  2. Grind the Fontana slab

    The surface opens edge to edge.

  3. Broadcast chips in Fontana

    Chips cover the base.

  4. Heat-rated seal

    The topcoat resists hot-tire pickup.

Fontana spaces

What we coat in Fontana

Garage

Garages in Fontana

Flake that stands up to summer heat.

Business

Truck and auto shops in Fontana

Systems quoted after a site visit.

Business

Warehouses in Fontana

Grind and seal or epoxy for dust control.

Outdoor

Patios in Fontana

Cooler outdoor blends.

Fontana homes

Owner homes along old Route 66

Fontana had 208,393 residents in the 2020 census, and 66.8% of occupied homes were owner occupied. Foothill Boulevard, once Route 66, runs through town.

Owners pick flake epoxy for the garage most often, and metallic epoxy for game rooms and offices.

Fontana systems

Epoxy floor systems for Fontana homes and shops

All four finish with a UV-stable polyaspartic topcoat.

1 day

Flake epoxy in Fontana

Chips that stand up to hot tires in a Fontana garage.

Flake epoxy details
Kaiser Steel and today

Fontana from steel town to logistics hub

Henry J. Kaiser built a large steel plant outside the city limits during the Second World War. Today the freeways that serve Fontana make it a trucking and logistics center.

Truck shops and yards need floors that take heavy loads and oil. We quote commercial epoxy flooring after a free site visit and also coat outdoor slabs with our outdoor concrete coatings.

Fontana is also home to Martin Tudor Jurupa Hills Regional Park, 861 acres at the northeast end of Mount Jurupa, and the city rises to about 2,600 feet in the Hunter's Ridge area.

Heat and trucks

Hot summers and a trucking hub

Fontana summers can climb well over 100 degrees. A hot tire on a hot slab can lift cheap coatings, which is why we use a polyaspartic topcoat rated for hot-tire pickup.

With Interstate 10, State Route 210 and Interstate 15 all nearby, Fontana is a trucking hub. Shop and warehouse floors here take heavy loads, and a grind and seal finish or a thicker epoxy system handles them.

Patios in full sun get an outdoor concrete coating with a UV-stable topcoat.

Fontana prices

Fontana epoxy floor prices

The table uses a typical two-car garage of up to 400 sq ft. Fontana home projects start at $2,600, and commercial floors are quoted after a free site visit.

SystemPer sq ftTypical two-car garage (up to 400 sq ft)Install time
Flake epoxy$6.50-$10 per sq ft$2,600-$4,0001 day
Solid color epoxy$9.50-$11.50 per sq ft$3,800-$4,6003 days
Metallic epoxy$12.50-$18.50 per sq ft$5,000-$7,4003-4 days
Quartz & sand finish$9-$16.50 per sq ft$3,600-$6,6002-3 days
Grind and seal$6.50-$9 per sq ft$2,600-$3,6001-2 days
Patio, driveway & pool deck coating$8-$12 per sq ft$3,200-$4,8001-2 days
Commercial & industrialQuoted after a free site visitQuoted after a free site visitDepends on size and downtime

Prices and details reviewed November 2026.

Book through our contact page.

Fontana questions

Fontana epoxy floor questions

How much does an epoxy garage floor cost in Fontana?

A flake garage floor in Fontana costs $2,600 to $4,000 for two cars and up to 400 sq ft, installed in one day.

Will a coating hold up to Fontana summer heat?

Yes. Our polyaspartic topcoat is rated for hot-tire pickup and UV stable.

Do you coat truck shop floors in Fontana?

Yes. Shops and warehouses are quoted after a free site visit.

Is Ping Epoxy Floors a Fontana company?

No. We are based in Pomona and serve Fontana from there.

What does metallic cost in Fontana?

Fontana metallic floors run $12.50 to $18.50 per sq ft over a 3-4 day install.

Is the estimate free?

Yes, with a moisture test and a written price.

Will an epoxy garage floor in Fontana lift from hot tires?

Not when the slab is ground and the topcoat is rated for hot-tire pickup, which ours is.

Which Fontana ZIP codes do you serve?

We serve 92331 and 92334 through 92337.

Do you coat truck yard slabs?

Yes. Outdoor and commercial slabs are quoted after a site visit.

How long does a Fontana flake garage take?

A Fontana flake garage takes one day. Walk on it that evening and park on it after 24 hours, even in summer heat.

Nearby cities

Cities near Fontana

We also coat floors in these nearby cities.

Free on-site estimate

Ready to see your slab coated?

We measure, test the concrete for moisture and give you a written price before any work starts. Projects start at $2,600.