Flake epoxy in West Covina
The standard for West Covina garages, with chips that hide wear.
Flake epoxy details

Garage floors, patio coatings and retail floors for West Covina homes and businesses.
★★★★★ 5-Star Rated · 93 reviews on Google, Facebook, Houzz & more
Free on-site estimate
Tell us about the floor and we will call you back to book a visit.
A West Covina flake garage floor of up to 400 sq ft costs $2,600 to $4,000, done in one day. Plan on $5,000 to $7,400 and 3-4 days for metallic. See the full build on our metallic epoxy page.
West Covina incorporated in 1923, in part to stop Covina from building a sewage farm in the area. It had 109,501 residents in the 2020 census. Permit questions go to the City of West Covina.
We are based in Pomona and drive west for every West Covina estimate. Your free visit includes a moisture test and a written quote.
Between 1950 and 1960, West Covina grew from fewer than 5,000 people to more than 50,000. Many garages date from that boom and carry decades of oil stains and cracks.
That wear is why every West Covina job starts with diamond grinding. Foothill Transit is based in the city too, and many commuters want the garage back fast. A one-day flake floor answers that.
All four come with a limited lifetime adhesion warranty.
The standard for West Covina garages, with chips that hide wear.
Flake epoxy detailsA bright floor for gyms, salons and back rooms.
Solid color epoxy detailsSwirled color for storefronts and showpiece rooms.
Metallic epoxy detailsA textured finish for wet rooms and ramps.
Quartz & sand finish detailsGarage floors here take one day, and storefronts get a schedule set at the visit.
We measure every area and take a moisture reading.
Decades of wear come off, and cracks get filled.
The base and chips or color go down.
A polyaspartic topcoat finishes the floor.
Flake, solid color or metallic over a ground slab.
Business floors quoted after a free site visit.
Slip-resistant coatings for backyard concrete.
In the 2020 census, 59.9% of occupied West Covina homes were owner occupied. The city grew fast in the building boom after the Second World War, so many garages and patios here have decades of wear.
A flake epoxy floor suits the garage, and an outdoor concrete coating suits the patio. Ask for both on one visit.
Plaza West Covina is a regional mall with 185 shops, stores and restaurants, and smaller retail centers line the main streets. Retail floors need a look that holds up to foot traffic and carts.
For storefronts and salons, metallic or flake floors give a finished look, and commercial epoxy flooring covers how we quote and schedule business work.
The San Gabriel Valley has a hot-summer Mediterranean climate, and storefronts with big windows get afternoon glare. A satin look or a mat at the door helps there.
A typical two-car garage here is up to 400 sq ft. Home projects in West Covina start at $2,600, and retail floors are quoted after a free site visit.
| System | Per sq ft | Typical two-car garage (up to 400 sq ft) | Install time |
|---|---|---|---|
| Flake epoxy | $6.50-$10 per sq ft | $2,600-$4,000 | 1 day |
| Solid color epoxy | $9.50-$11.50 per sq ft | $3,800-$4,600 | 3 days |
| Metallic epoxy | $12.50-$18.50 per sq ft | $5,000-$7,400 | 3-4 days |
| Quartz & sand finish | $9-$16.50 per sq ft | $3,600-$6,600 | 2-3 days |
| Grind and seal | $6.50-$9 per sq ft | $2,600-$3,600 | 1-2 days |
| Patio, driveway & pool deck coating | $8-$12 per sq ft | $3,200-$4,800 | 1-2 days |
| Commercial & industrial | Quoted after a free site visit | Quoted after a free site visit | Depends on size and downtime |
Prices and details reviewed November 2026.
Compare blends on our color chart.
A two-car flake floor in West Covina costs $2,600 to $4,000 for up to 400 sq ft and takes one day.
No. We run the business from Pomona and come to your West Covina home or business for the free estimate.
Yes. Retail and salon floors are quoted after a free site visit, and we schedule around your business hours.
Yes. Driveway and patio coatings cost $8 to $12 per sq ft, with a textured topcoat for grip on slopes.
A metallic floor takes 3-4 days from grinding to topcoat.
No, when the slab is ground and the topcoat is right. We diamond grind every slab and use a polyaspartic topcoat rated for hot-tire pickup.
Many date from the 1950s building boom, so they often need crack repair before coating.
Many landlords choose grind and seal or flake for rentals because both clean easily between tenants.
We serve 91790, 91791, 91792 and 91793.
Yes. Salon and retail floors are quoted after a free site visit.
We also coat floors in these nearby cities.
We measure, test the concrete for moisture and give you a written price before any work starts. Projects start at $2,600.